HomeProjectsLocationContact us中文
USP logoUnited Steel ProductsTianjin Wanlite Construction Steel Products Co., Ltd 中文
Home / Products / Mining structures

Mining structures

CC2 · CC3AS/NZS 5131 construction category
1554.5Fatigue purpose welding
41Weld procedures on two Pilbara jobs
6Mining contracts since 2025

Fatigue rated steel for iron ore and gold

For BHP's Jimblebar TLO replacement we priced, qualified and delivered fatigue purpose welding to AS/NZS 1554.5 on the rail support and bin modules, with liner plate stud welding to AS/NZS 1554.2, under AS/NZS 5131 construction categories C2 and C3.

It is current work in the shop this year.

  • AS/NZS 1554.1 SP, 1554.2 and 1554.5
  • AS/NZS 5131 CC2 and CC3
  • 22 WPS on Brockman, 19 on Jimblebar
  • Third party NDT with daily reports
  • Chutes, bins, transfer towers and conveyor steel
Fekola lime storageChutes
Hope DownsCadia EastWest Angelas
Reference work

Delivered

ProjectScopeYear
Brockman Syncline 1, Hamersley Iron (Rio Tinto)Structural steel2025–2026
Jimblebar TLO Replacement, BHPRail support and bin modules, fatigue welding to AS/NZS 1554.52025–2026
Oyu Tolgoi, MongoliaConcentrator bagging plant2025
Iron Bark and Gekko, AustraliaContracted mining packages2026
B2Gold Fekola, MaliSteelwork; earlier 120,000 dia in of spools2016, 2026

Send us the drawings and the deadline

We quote from isometrics, general arrangements or a bill of quantities. Tell us the code, the material and the date you need the offer by.

Send an inquiry