Every contracted job, delivered or in production, by product category. Revision October 2026. Quotations are not listed.

34,000 tstructural steel delivered, 2008 to 2025
20,000 tpower plant ACC and cooling tower steel, 2005 to 2025
3,000+skids delivered since 2015, plus about 490 in production
375,000dia-in of pipe spools
166projects delivered23 in production

Categories

Download the reference list (PDF) › Project experience by sector ›

Quantities are fabricated quantities unless the scope says otherwise; coating-only work is listed separately and is not included in fabricated tonnage. Client and end owner names are given where the contract allows.

Category 01 / 11

Process skids and modules

41 delivered7 in production
Process skids and modules
Project and scopeClientEnd ownerLocationQuantityYearStatus
OPS skidSinostructAPLNG / Origin EnergyAustralia—2015-2016● Delivered
WHS wellhead separator skids: vessels, on-skid piping, distribution pipingSinostructAPLNG / Origin EnergyAustralia600 sets2015-2016● Delivered
Ammonia flow control skidsSinostructLP AminaUSA9 sets2016● Delivered
GLNG wellhead separator skids 94 + 76 + 17SinostructSantos (GLNG)Australia187 sets2016-2017● Delivered
ODI one-day-install skids with distribution pipingSinostructAPLNG / Origin EnergyAustralia200 sets2016-2017● Delivered
KODI knockout skidsSinostructAPLNG / Origin EnergyAustralia20 sets2018● Delivered
ODI skidsSinostructAPLNG / Origin EnergyAustralia150 sets2018● Delivered
SOLO skidsSinostructAPLNG / Origin EnergyAustralia29 sets2018● Delivered
SSP separator surface pump skidsSinostructAPLNG / Origin EnergyAustralia25 sets2018● Delivered
GLNG Lean 123 + 2P 230 + V3 219 skidsSinostructSantos (GLNG)Australia572 sets2018-2019● Delivered
ODI skids (101 + 179)SinostructAPLNG / Origin EnergyAustralia280 sets2019● Delivered
SSP skidsSinostructAPLNG / Origin EnergyAustralia29 sets2019● Delivered
SSP skids (68 + 55)SinostructAPLNG / Origin EnergyAustralia123 sets2019-2020● Delivered
WHS skidsSinostruct / InteforgeAPLNG / Origin EnergyAustralia262 sets2019-2024● Delivered
Acrylonitrile incinerator pipe skids普灿沧海环保设备(北京) (PCC)Zhejiang PetrochemicalChina7 sets2020● Delivered
ODI skidsSinostructAPLNG / Origin EnergyAustralia105 sets2020● Delivered
SSP skids, additional batchSinostructAPLNG / Origin EnergyAustralia8 sets2020● Delivered
KODI skids (10 + 10 + 10 + 10)Sinostruct / InteforgeAPLNG / Origin EnergyAustralia40 sets2020-2023● Delivered
Acrylonitrile incinerator pipe skidPCCChongqing DideChina1 sets2021● Delivered
Acrylonitrile incinerator pipe skidsPCCLihuayi 利华益China8 sets2021● Delivered
Acrylonitrile incinerator pipe skidsPCCJiangsu SierbangChina9 sets2021● Delivered
Acrylonitrile incinerator pipe skidsPCCJieyang, GuangdongChina4 sets2021● Delivered
Acrylonitrile incinerator pipe skidsPCCHainanChina5 sets2021-2022● Delivered
Acrylonitrile incinerator pipe skidsPCCYantai WanhuaChina2 sets2021-2022● Delivered
CFU, water treatment, hydrocyclone and TDAF skids (3 + 3)天津惠永达 (Feverfield)CNOOC Enping / XijiangChina6 sets2022● Delivered
SSP+VSD skids 94 + 5, VSD 50, packing frames 12.25 tSinostructAPLNG / Origin EnergyAustralia149 sets2022● Delivered
Silica-gel dehydration skid天津惠永达 (Feverfield)Sinopec Shengli oilfieldChina1 sets2022● Delivered
Air-floating and hydrocyclone skid天津惠永达 (Feverfield)CNOOC Lufeng phase IIChina1 sets2022-2023● Delivered
ONE skids (34 + 7)SinostructAPLNG / Origin EnergyAustralia41 sets2022-2023● Delivered
TEG dehydration + cold box skids (2, Tunisia); New Regeneration Unit skids (6, Algeria)天津惠永达 (Feverfield)Jereh 杰瑞Tunisia (C22007) / Algeria (C23002)8 sets2022-2023● Delivered
Pipe skidsPCCSinopec Tianjin (Nangang ethylene)China9 sets2023● Delivered
Pipe skidsPCCJiangsu Sierbang phase 4 (Lianyungang)China9 sets2023● Delivered
Skid groupsPCCWanhua phase II revampChina2 sets2023● Delivered
KODI 10 sets + SE pump skids 8 setsInteforgeAPLNG / Origin EnergyAustralia18 sets2024● Delivered
Pipe skidsPCCPetroChina Jilin PetrochemicalChina8 sets2024● Delivered
Sludge treatment skid天津惠永达 (Feverfield)—China15 t2024● Delivered
ONE skidsInteforgeAPLNG / Origin EnergyAustralia23 sets2025● Delivered
SE pump skids 3 + 2 (est.) + HC SE pump 1InteforgeAPLNG / Origin EnergyAustralia6 sets2025● Delivered
SSP pump skids PR015InteforgeAPLNG / Origin EnergyAustralia14 sets2025● Delivered
Trial pre-assembly and assembly of 7 water-treatment modules天津惠永达 (Feverfield)CNOOC WeizhouChina7 modules2025● Delivered
120 WHS skids + 120 control valve assemblies, risers, off-skid TFInteforgeAPLNG / Origin EnergyAustralia120 sets2025-2026● In production
ONE skids 40 + 11 with duplex piping; 51 dual-annulus off-skid spool setsInteforgeAPLNG / Origin EnergyAustralia51 sets2025-2026● In production
SSP skids 29 + 12 (est.) + 15InteforgeAPLNG / Origin EnergyAustralia56 sets2025-2026● In production
SSP skids 45 + 25 + 27, + 4 + 1InteforgeAPLNG / Origin EnergyAustralia102 sets2025-2026● Delivered
WHS skids 14 (VO28 DP187) + 14 (VO33) + 7 (DP400)InteforgeAPLNG / Origin EnergyAustralia35 sets2025-2026● In production
SSP skids 49 + 30InteforgeAPLNG / Origin EnergyAustralia79 sets2026● In production
VSD skidsInteforgeAPLNG / Origin EnergyAustralia54 sets2026● In production
WHS skids + distribution pipingInteforgeAPLNG / Origin EnergyAustralia99 sets2026● In production
Category 02 / 11

Pipe spools

12 delivered5 in production
Pipe spools
Project and scopeClientEnd ownerLocationQuantityYearStatus
Fekola: carbon steel, rubber-lined (excl. lining) and steam pipingSinostructB2GoldMali120,000 dia-in2016● Delivered
Lubrizol Zeus pipe spoolsJacobsLubrizolUSA170,000 dia-in2017-2018● Delivered
West Angelas pipe spoolsRio TintoRio TintoAustralia10,000 dia-in2019● Delivered
Hong Kong water treatment works: pipe fabrication and paintingAcciona AguaAccionaHong Kong—2021● Delivered
Distribution / vent lines, ceramic painted lines, SS+CS reboiler spoolsSinostructOrigin Energy (APLNG)Australia418 lines2022● Delivered
Duplex stainless spools巨森澳亚工程装备(天津)Origin Energy (APLNG)Australia160 sets2022● Delivered
Pipe material and part prefabrication, pilot plant天津惠永达石油工程技术有限公司CNOOC Zhanjiang pilotChina1 sets2022● Delivered
Oyu Tolgoi pipe spools with painting, pipe supports, fire-water pipingInteforge (Worley, Monadelphous)Rio Tinto (Oyu Tolgoi)Mongolia30,000 dia-in2022-2024● Delivered
Supplementary piping for gold mine (金矿补管线)Inteforge——1 pcs2023● Delivered
Albemarle pipe spools fabrication + paintingInteforgeAlbemarleAustralia45,000 dia-in2023-2024● Delivered
WHS variation spools, lines, ceramic spools, distribution spool setsInteforgeOrigin Energy (APLNG)Australia168 lines/sets2024● Delivered
Carbon steel and stainless ASME process pipingSACMI (Foshan)SACMI ELK demoGermany1 sets2025-2026● Delivered
Fekola replacement rubber-lined spools, fittings, steelwork 27.7 tInteforgeB2GoldMali11 lines2025-2026● In production
Legacy combo spools 30 sets (QO63), auto-drain kits 12, Ironbark lines 5; combo bypass spools QO55 (no qty)InteforgeAPLNG / Origin EnergyAustralia47 sets2025-2026● In production
Water bypass spools 40 sets (QO025), ODI-to-WHS conversion spools 11 (QO024), WHS off-skid spools 25 (QO027)InteforgeAPLNG / Origin EnergyAustralia12,886 dia-in2025-2026● In production
Iron Bark pipingInteforgeOrigin EnergyAustralia13 t2026● In production
WHS off-skid / legacy combo spools 20 sets (QO75 4,485 dia-in) + XV option 40 lines (QO92 1,600 dia-in)InteforgeAPLNG / Origin EnergyAustralia6,085 dia-in2026● In production
Category 03 / 11

Pressure vessels and tanks

5 delivered
Pressure vessels and tanks
Project and scopeClientEnd ownerLocationQuantityYearStatus
-TK tank fabricationSinostrut—Australia69 t2020-2021● Delivered
Filter units天津惠永达 (Feverfield)—China2 pcs2022● Delivered
6 x separator vessels, two batchesSinostructAPLNG / Origin EnergyAustralia12 pcs2023● Delivered
WHS tanks (5)InteforgeAPLNG / Origin EnergyAustralia5 pcs2024● Delivered
ASME VIII Div.1 vacuum tower (deaerator) 25 t + piping/assembly; 3.8 t extra天津惠永达 (Feverfield)—China25 t2025● Delivered
Category 04 / 11

Structural steel

37 delivered4 in production
Structural steel
Project and scopeClientEnd ownerLocationQuantityYearStatus
Building steel structure—HeBei XiangHe First CityChina20,200 m22001● Delivered
Building steel structure—Beijing Golden Season Shopping CenterChina112,780 m22002-2003● Delivered
Hi-frequency 610 pipe welding shop—Tianjin ShuangJie PipingChina39,810 m22004● Delivered
Building steel structure—Beijing Oriental Auto CityChina69,000 m22005● Delivered
Float glass production shop phase 1—ShanXi LiHu GlassChina47,698 m22005● Delivered
Casting workshops building steel—ShenYang Machinery ManufacturingChina126,000 m22006● Delivered
Liquid milk production shop building steel—JinHai YiLi DairyChina50,000 m22006● Delivered
Production workshops building steel—HeBei YaoHua GlassChina25,896 m22006● Delivered
Production facility phase 6 building steel—MengNiu DairyChina62,180 m22007● Delivered
Exhibition centre building steel—LangFang WanZhuang Eco CityChina200 t2008● Delivered
Building steel structure, new energy project—NanYang Cable ManufacturingChina81,200 m22009● Delivered
Building steel structure, production facility—ZhongYuHua Steel Mill GroupChina55,752 m22010● Delivered
Cadia East: structural steel, conveyor trusses, chutes and binsNewcrest MiningNewcrestAustralia2,400 t2011● Delivered
Kestrel Coal Mine: structural steel, gratings, handrailsRio TintoRio TintoAustralia500 t2012● Delivered
Hope Downs 4: structural steel, trusses, chutes, grating, guards, handrailsRio TintoRio TintoAustralia1,450 t2013● Delivered
Marandoo: structural steel, trusses, chutes, grating, guards, handrailsRio TintoRio TintoAustralia2,200 t2013● Delivered
Western Turner Syncline: structural steel, trusses, chutes, cladding, grating, guards, handrailsRio TintoRio TintoAustralia2,700 t2013● Delivered
Cape Lambert Port B: structural steel, trusses, chutes, grating, guards, handrailsRio TintoRio TintoAustralia1,300 t2014● Delivered
Conveyor galleries and gantry modules, fully assembledWiggins Island Coal Export Terminal Pty LtdWICETAustralia1,000 t2014● Delivered
Grosvenor Phase 2: structural steel, grating, guards, handrailsAnglo AmericanAnglo AmericanAustralia1,900 t2015● Delivered
AGL Loy Yang conveyor: structural steel, trusses, platework, grating, handrailsSinostructAGLAustralia1,500 t2016● Delivered
Fekola Gold Mine: structural steel, trusses, grating, handrails, cladding, purlinsSinostructB2GoldMali3,500 t2016● Delivered
Bass Point Quarry: structural steel, trusses, grating, handrailsSinostructHansonAustralia1,100 t2016-2017● Delivered
Steel platform and stairs, fabrication and installation诺和诺德(中国)制药有限公司Novo NordiskChina—2017● Delivered
Lubrizol Zeus: structural steel and process modules / pipe rackSinostructLubrizolUSA1,700 t2017-2018● Delivered
Boiler-island light-steel roofs, close-coupled enclosures and boiler steel, 15 distinct plants in 16 contracts北京德普新源科技发展有限公司Everbright Environment 光大 / CHN EnergyChina15 plants2017-2020● Delivered
G3 Terminal Vancouver: structural steel, grating, handrailsKiewitG3 Global Grain GroupCanada3,000 t2018● Delivered
Oyu Tolgoi: underground and above-ground structural steel, mechanical structure, chutes, bins, grating, guards, handrailsSinostruct / Inteforge (Worley, Monadelphous)Rio Tinto (Oyu Tolgoi)Mongolia2,900 t2018-2024● Delivered
Fekola expansion: structural steel, chutes, cladding, grating, handrails; rubber-lined platework and spoolingSinostruct (Lycopodium)B2GoldMali500 t2019● Delivered
South Flanks: structural steel (H-frames, PG beams, angle shims, loose items)Bomesc 天津博迈科 (Jacobs)BHPAustralia1,100 t2019● Delivered
West Angelas: structural steel, conveyor modules, chutes (+4,000 m2 grating, 5,000 lm handrails, 2,500 m2 guards)Sinostruct (Monadelphous)Rio TintoAustralia1,100 t2019-2020● Delivered
Western Turner Syncline 2: structural steel, grizzly feeder structures, trusses, chutes, cladding, grating, guards, handrailsSinostruct (Monadelphous)Rio TintoAustralia1,400 t2020-2021● Delivered
Welded H-section beam fabrication (CNOOC PG beams)天津市恒福鑫石油科技有限公司CNOOC 中海油 (PG beams)China200 t2021● Delivered
Additional platform structure, Xijiang/Enping天津惠永达石油工程技术有限公司 (Feverfield)CNOOC (Xijiang/Enping)China2.2 t2022● Delivered
Kathleen Valley lithium: structural steel, trusses, grizzly feeder structures, FP frames, platework, chutes, tanks, bins, TFsInteforgeLiontown Resources (Lycopodium)Australia1,750 t2022-2024● Delivered
FMG Christmas Creek: structural steel, trusses, grating, handrails, mesh guards, pre-assembledInteforgeFortescue (FMG)Australia522 t2023● Delivered
Pluto 1 Cable Trench 2: 24 cable-trench bridgesInteforgeWoodsideAustralia176 t2025● Delivered
Brockman Syncline 1: structural steel 793 t + trusses 580 t, bins, chutes, grating 3,700 m2, handrails 7,000 mInteforgeRio Tinto (Hamersley Iron)Australia1,373 t2025-2026● In production
Cape Lambert A CLAHDO: plant structural steel, trusses, bins, grating, handrails; pipingInteforgeRio TintoAustralia852 t2025-2026● In production
Hegigio bridge structural steelInteforge—Papua New Guinea91 t2026● In production
Iron Bark: pipe supportsInteforgeOrigin EnergyAustralia80 t2026● In production
Category 05 / 11

Platework, bins and chutes

2 delivered
Platework, bins and chutes
Project and scopeClientEnd ownerLocationQuantityYearStatus
Hopper and bin fabrication联安—China26 t2023● Delivered
OT Concentrator Bagging Plant: 27 chutes 11 t, 17 piping ISOs, structural 27.54 tInteforge (Worley)Rio Tinto (Oyu Tolgoi)Mongolia39 t2025● Delivered
Category 06 / 11

Grating, handrail and access steel

6 delivered3 in production
Grating, handrail and access steel
Project and scopeClientEnd ownerLocationQuantityYearStatus
CLB50 grating and handrails——Australia450 t2012● Delivered
Gratings and handrailsSinostructTOGGSAustralia—2019● Delivered
20 A325 MSG grating panels天津惠永达 (Feverfield)—China29 m22022● Delivered
Ashburton grating, handrails, mesh guardsInteforge—Australia—2023● Delivered
1 grating panelInteforge—Australia1 pcs2024● Delivered
Grating packages天津惠永达 (Feverfield)CNOOC Weizhou / Huizhou 258 / XijiangChina36 t2025● Delivered
Jimblebar TLO2: grating 1,080 m2, handrails, mesh guards, bollards, structural steel 158 t, piping 4,930 dia-inInteforgeBHPAustralia158 t2025-2026● In production
HD1/HD2 grating and handrailsInteforge—Australia—2026● In production
Handrail fabrication and galvanizingInteforgeGekko SystemsAustralia698 m2026● In production
Category 07 / 11

Air cooled condensers and heat exchange

35 delivered4 in production
Air cooled condensers and heat exchange
Project and scopeClientEnd ownerLocationQuantityYearStatus
Windwall and partition-wall claddingSPX Cooling Technologies (China)HouZhou ACC phase IChina8,000 m22004● Delivered
Windwall and partition-wall claddingSPX Cooling Technologies (China)HeJin ACCChina8,000 m22004● Delivered
Upper structures, steam ducts, piping, claddingSPX Cooling Technologies (China)YongJi ACCChina1,300 t2005● Delivered
Steam ductsSPX Cooling Technologies (China)MengXi ACCChina620 t2006● Delivered
Upper structures and claddingSPX Cooling Technologies (China)BaoTou II ACCChina1,250 t2006● Delivered
Upper structures, steam ducts, piping, claddingSPX Cooling Technologies (China)XinZhou ACCChina960 t2006● Delivered
Windwall and partition-wall claddingSPX Cooling Technologies (China)Dalate ACCChina11,000 m22006● Delivered
Upper structures and claddingSPX Cooling Technologies (China)BaoTou I ACCChina1,250 t2006-2007● Delivered
Steam raisers / ductsSPX Cooling Technologies (Germany)Terras power plantItaly50 t2007● Delivered
Steam raisers / ductsSPX Cooling Technologies (Germany)Revenna ACCPortugal25 t2007● Delivered
Upper structures and claddingSPX Cooling Technologies (China)ShenHua YiLi ACCChina1,400 t2007● Delivered
Windwall and partition-wall claddingSPX Cooling Technologies (China)LanZhou Aluminium ACCChina11,000 m22007● Delivered
Upper structuresSPX Cooling Technologies (Germany)Raijmond power plantNetherlands950 t2008● Delivered
Windwall and partition-wall claddingSPX Cooling Technologies (China)HouZhou ACC (listed again as phase I, 2008)China8,000 m22008● Delivered
Lower and upper structuresSPX Cooling Technologies (Germany)Thiva-Heron power plantGreece1,400 t2009● Delivered
Lower and upper structuresSPX Cooling Technologies (Germany)Severn PowerUnited Kingdom2,100 t2010● Delivered
Lower and upper structures, claddingSPX Cooling Technologies (China)YuanYangHu (YYH) ACCChina3,000 t2010● Delivered
Air-cooling structures for refineriesHamon D'Hondt SA (France)Petrobras AB-PGI/COMPERJBrazil240 t2011● Delivered
Lower and upper structures, claddingSPX Cooling Technologies (China)ShangDu ACC phase 3China1,700 t2011● Delivered
Steel structuresHamon D'Hondt SA (France)KNPC Mina Alahmadi refineryKuwait190 t2011● Delivered
Upper structuresSPX Cooling Technologies (USA)Olmsted Power, MNUSA120 t2011● Delivered
Internal beam structuresHamon D'Hondt SA (France)—Bulgaria170 t2012● Delivered
Steel structures and steam ductsSPX Cooling Technologies (USA)Nikiski power plant, AlaskaUSA490 t2012● Delivered
Steel structures and silosAlstom PowerVantaan EnergiaFinland290 t2013● Delivered
Steel structuresHamon D'Hondt SA (France)Saudi Aramco Shaybah NGLSaudi Arabia400 t2013-2014● Delivered
Steel structures for ACCEsindus SA (Spain)Fort St. James biomass, BCCanada300 t2015● Delivered
Steel structures for ACCEsindus SA (Spain)Merritt biomass, BCCanada300 t2015-2016● Delivered
Base frames and supports H5445A20 DU施必得(山西)B&W SPIGChina17 t2023● Delivered
Stainless steel fabrication / duplex bending (F5945, F5843, F5979A23)施必得(山西)B&W SPIGChina1.0425 t2023-2024● Delivered
ACC steel structure fabrication, galvanizing, packingSPIG S.p.A. (Italy)B&W SPIG—197 t2024● Delivered
Header box fabrication and painting F5085A23施必得(山西)B&W SPIGChina13 t2024● Delivered
48 stainless removable floating-head cover boxes: fabrication, hydro, pickling/passivation, repair (SEN0679/A4055A24)施必得(山西)B&W SPIGChina17 t2024-2025● Delivered
16 x 2 stainless header boxes施必得(山西)B&W SPIGChina16 sets2025● Delivered
Floating-head cover boxes phase 2 (二期), 48 boxes, same order SEN0679/A4055A24施必得(山西)B&W SPIGChina17 t2025● Delivered
Shatlyk AFC steel structures (IT order 4200043620)SPIG S.p.A. (Italy)B&W SPIGTurkmenistan175 t2025● Delivered
Chassis frames F-6062A25 / F22050 (SEN-0908)施必得(山西)冷却技术 (SSCT)B&W SPIGChina65 t2025-2026● In production
36 sets 316L stainless header boxesSSCT 山西施必德B&W SPIGChina31 t2026● In production
AFC steel structures, 7 projects under one frame order (A-6097A25IT, order 4200044649)SPIG ItalyB&W SPIG—141 t2026● In production
Chassis frames SEN01149 / SEN01151SSCT 山西施必德B&W SPIGChina28 t2026● In production
Category 08 / 11

Indirect dry cooling towers

3 delivered
Project and scopeClientEnd ownerLocationQuantityYearStatus
Steel structuresSPX Cooling Technologies (China)QinLing IDCTChina400 t2011● Delivered
Steel structuresSPX Cooling Technologies (China)ZuoQuan IDCTChina750 t2011● Delivered
Steel structuresSPX Cooling Technologies (China)WuAn IDCTChina300 t2012● Delivered
Category 09 / 11

OEM machined and fabricated components

4 delivered
Project and scopeClientEnd ownerLocationQuantityYearStatus
Fabricated equipment order M1284IBS China—China—2017● Delivered
Turbine rotor housings, rotor/stator transport brackets, protective end covers, LP inner casingsGEGE power plants: Wucaiwan, Yangzhou 4, Ningde 3, Dabieshan, Qinghe 9, Shentou II-4, Beilun 3, Hubco (Pakistan), Hassyan 3 (Dubai)China / Pakistan / UAE16 orders2017-2019● Delivered
Test specimens: fabrication, machining, galvanizing三之信Airbus 空客China6 pcs2024● Delivered
SPIG 10th anniversary stainless monument施必得(山西)B&W SPIGChina1 pcs2025● Delivered
Category 10 / 11

Surface treatment and coating services

11 delivered
Surface treatment and coating services
Project and scopeClientEnd ownerLocationQuantityYearStatus
Structural steel painting, packing-frame fabrication, packing日照鼎立钢构Cameroon projectCameroon124 t2021-2022● Delivered
3 x 100,000 m3 crude tanks, painting onlyChina OilNigeria-Benin crude export pipelineNigeria / Benin6,400 t2022● Delivered
PG beam prefabrication and painting天津新世纪科技CNOOC Kenli oilfield revampChina110 t2022● Delivered
Third-party blast cleaning and painting联安今迈 / 天海喷漆 / 积木和力—China3,056 t2022● Delivered
Vessel blasting and painting新乡市新晨净化科技Shengli / LufengChina4 pcs2022● Delivered
Component, pipe, header, tube-sheet, steam-duct painting and post-galvanizing finishing施必得(山西)/ SSCTB&W SPIGChina571 t2022-2025● Delivered
Raw material and surplus painting, cut-to-length and packingSinostruct / InteforgeRio Tinto (Oyu Tolgoi) and othersMongolia / Australia85 t2022-2025● Delivered
Carbon steel vessels blasting and painting (2 + 10)Inteforge—Australia12 pcs2023● Delivered
Frame painting 3.6 t; fittings blasting and painting 162.26 m2天津泰可瑞特 / 天海—China3.6 t2023● Delivered
48 side frames painted and packed, 2 packing frames (A4055A24)施必得(山西)B&W SPIGChina70 t2024● Delivered
Stainless pipe coating, preservation, dispatch天津博迈科海洋工程 (Bomesc)Modec RAIA topsideChina1,103 m22024● Delivered
Category 11 / 11

Buildings and other

10 delivered
Project and scopeClientEnd ownerLocationQuantityYearStatus
Minor orders, fees, packing frames 4.5 t, cancelledvariousvariousvarious—2017-2025● Delivered
200 stools (墩子)Sinostrut—Australia200 pcs2020● Delivered
Crane mats, pins, lifting lugsSinostrutFagioliAustralia—2021● Delivered
Modification of existing skids (1 + 2)天津惠永达 (Feverfield)—China3 sets2021● Delivered
Super duplex bolting/fittings purchase 749 pcs; 4 DN1200 flangesAcciona AguaAcciona (Hong Kong water treatment)Hong Kong753 pcs2021-2023● Delivered
Gusset (triangle) platesJJC 北京捷杰西石油设备—China10 sets2022● Delivered
Support test specimensSinostruct—Australia24 pcs2022● Delivered
Cutting and bending of pipe bends湖南格润德管业—China96 pcs2022-2023● Delivered
Site packers, shims, washers, bollards, T-braces, channels, beamsSinostruct / Inteforge (Monadelphous)Rio Tinto (Oyu Tolgoi)Mongolia6,548 pcs2022-2024● Delivered
Grating, handrail, piping painting, base galvanizing, electrical labour on 2 skidsInteforge—Australia2 sets2023● Delivered