Oil & gas

APLNG Upstream Sustain
1,953 wellhead separation, ODI, KODI, SOLO and SSP skids with full M/E/I. 724,404 dia in of pipe. Operators ConocoPhillips, Origin Energy, Sinopec.

GLNG Upstream Development
759 wellhead separator skids, full M/E/I. 341,550 dia in. Operators Santos, TotalEnergies, PETRONAS, KOGAS.

Separator and surface pump skids
307 skids in the 2026 order book across four skid programs, plus riser and spool sets.
Mining

Brockman Syncline 1
Structural steel for Hamersley Iron.

Jimblebar TLO Replacement
Rail support and bin modules, fatigue welding to AS/NZS 1554.5.

Fekola gold mine
120,000 dia in of spools in 2016; steelwork in 2026.
Chemical & power

Lubrizol Zeus
27 pipe rack modules to 70 t each, 170,000 dia in.

Severn Power
Steel fabricated for the Severn Power station.

Nigeria to Benin export pipeline
3 crude oil tanks, 6,400 t, painting.
Packages

Jereh Group
60 t TEG dehydration skid shipped in six modules, cold box platform, gas metering.

Process Combustion Corporation
54 wastewater and off gas incinerator units.

John Cockerill
9 ammonia injection SCR skids to 20 t.