3,500+Skids delivered to date
348Skids delivered in 2025
100 setsMonthly capacity
7,000 m²Assembly halls
Fully assembled, tested and packed before they leave
We build the skid frame, the piping, the pipe supports, the vessels, the handrail and the grating ourselves, then assemble mechanical, electrical and instrumentation work in four dust controlled rooms.
The standard assembly envelope is 32 m × 5 m × 5 m. The largest skid delivered to date measured 33.6 m × 7.32 m × 7.02 m.
- Wellhead separation, ODI, KODI, SOLO and SSP skids
- TEG, MEG, CFU, chemical injection, pump and filter packages
- Ammonia injection SCR skids and gas metering systems
- FAT and pre-commissioning in house
- Seaworthy packing with nitrogen purge






Reference work
Delivered
| Project | Scope | Year |
|---|---|---|
| APLNG Upstream Sustain, Australia | 1,953 wellhead separation, ODI, KODI, SOLO and SSP skids, full M/E/I. 724,404 dia in | 2015–2023 |
| GLNG Upstream Development, Australia | 759 wellhead separator skids, full M/E/I. 341,550 dia in | 2017–2019 |
| Jereh Group, Tunisia | 60 t TEG dehydration skid shipped in 6 modules, cold box platform, gas metering | 2022–2023 |
| Process Combustion Corporation | 54 wastewater and off gas incinerator units | 2021–2023 |
| CNOOC Enping-51 platform | Compact flotation and hydrocyclone skids | 2022 |
| Sinopec Shengli CCUS | 25 t gas dehydration skid | 2022 |
| John Cockerill, USA | 9 ammonia injection SCR skids to 20 t | 2018 |
Send us the drawings and the deadline
We quote from isometrics, general arrangements or a bill of quantities. Tell us the code, the material and the date you need the offer by.